At the government benchmark prices behind the PM Surya Ghar subsidy, a 3 kW rooftop solar system works out to roughly Rs 1.45 lakh before subsidy and about Rs 67,000 after the Rs 78,000 central subsidy. Real market quotes vary with brand, roof type and location, and many households pay more than the benchmark.
This guide shows what drives the price, how to read a quote and how long a system typically takes to pay for itself.
The central subsidy figures published on the India.gov.in PM Surya Ghar page are set at benchmark prices. Working backwards from them gives these approximate benchmark costs. They are our estimate, not a price list, and real quotes will differ.
| System size | Benchmark cost (approx.) | Central subsidy | Cost after subsidy (approx.) |
|---|---|---|---|
| 1 kW | Rs 50,000 | Rs 30,000 | Rs 20,000 |
| 2 kW | Rs 1,00,000 | Rs 60,000 | Rs 40,000 |
| 3 kW | Rs 1,45,000 | Rs 78,000 | Rs 67,000 |
Subsidy applies to eligible residential households. Businesses and factories do not receive this subsidy, and their costs depend on system size, equipment and site conditions.
A clear quote lists more than a price per kW. Check that it covers:
This is an illustration with assumed numbers. Your results will differ.
In reality, fixed charges on your bill do not disappear, and savings depend on how much solar power you use directly and how your state settles exported units. Our net metering guide explains the settlement. After payback, the system keeps generating for 25 years or more, as covered in how solar panels work.
Larger systems usually cost less per kW because fixed costs, such as design, transport, approvals and installation visits, are spread over more panels. The official benchmark figures also show this: the first kW is higher, and additional kW come at a lower step cost. That is why a 3 kW system costs less than three times a 1 kW system.
The purchase price is not the only cost. Plan for these as well:
| Item | Typical timing | Notes |
|---|---|---|
| Panel cleaning | Every few weeks | Low cost if done at home with water and a soft cloth |
| Annual inspection | Once a year | Check wiring, earthing, mounting and inverter |
| Inverter replacement | Often after 10 to 15 years | Usually the main mid-life expense |
| Battery replacement (hybrid or off-grid) | Depends on battery type and use | Can be a significant cost |
The table below is a made-up illustration of why the cheapest quote is not always the best. The numbers are only examples.
| Item | Quote A | Quote B | Quote C |
|---|---|---|---|
| Price for 3 kW | Lowest | Middle | Highest |
| Panel and inverter brands | Not named | Named, with datasheets | Named, with datasheets |
| Structure | Light-gauge, not specified | Specified, wind-rated | Specified, wind-rated |
| Net meter and subsidy support | Not included | Included | Included |
| After-sales service | Not stated | Stated | Stated with response time |
Quote A may look attractive, but its missing details could cost you more later. Ask each vendor to fill in the same checklist.
The central residential subsidy does not apply to commercial and industrial buildings, so their cost depends on system size, equipment and site conditions. These users often benefit from large daytime consumption, which matches solar generation well. Ask your installer and tax advisor about any other benefits that may apply to your business.
Rooftop solar in India has become far more affordable, especially for homes that qualify for the central subsidy. The best price is not the lowest one, but the quote with the right equipment, clear warranty and reliable service.
Want a number for your own roof? Contact a certified solar installer for a free site assessment and a detailed, subsidy-ready quote.
Working back from official subsidy figures, the benchmark cost of a 3 kW system is roughly Rs 1.45 lakh before subsidy. Actual quotes vary by brand, roof and state, and many are higher than the benchmark.
Eligible households get a central subsidy of up to Rs 78,000 for a 3 kW system under the PM Surya Ghar Muft Bijli Yojana, at current benchmark prices.
At benchmark prices the first kW works out to about Rs 50,000. Market prices differ with panel type, inverter, structure and installer, so compare written quotes.
In a sunny part of India, a 1 kW rooftop system often generates around 4 to 5 units (kWh) per day. Your installer can give a site-specific estimate.
Payback depends on your tariff, usage, system price and subsidy. Many households recover the cost within a few years, and the system keeps producing for 25 years or more.
Quotes differ because of panel and inverter brands, structure design, roof type, warranty terms and the installer's service. Always compare like-for-like specifications.
As a rough guide, you need about 10 square metres (around 100 sq ft) of shadow-free roof for each kW of solar.
Very little. You mainly need panel cleaning and an annual inspection. The inverter may need replacement after 10 to 15 years.
Fixed costs such as design, transport, approvals and installation visits are spread across more panels, so the cost per kW usually falls as the system grows.
Ask about structure height, extra cabling, DISCOM fees, roof repairs, monitoring modules and taxes, and check what the quote includes and excludes.
It depends on the inverter capacity and brand. Inverters often need replacing after 10 to 15 years, so ask your installer for the likely cost and warranty.
Banks and financial institutions offer rooftop solar loans. Compare interest rates, repayment periods and charges before you choose.